New York Septic ProNew York

New septic system installation

New systems are designed around the soil, slope, setbacks and the local permit; the permitting authority inspects before the system is covered.

Septic tank formwork and access riser before the concrete lid is poured (historic photo)
Photo: Carl E. Jepson, Wikimedia Commons, Public domain

New systems are designed around the soil, slope, setbacks and the local permit; the permitting authority inspects before the system is covered.

Do this first

  • Cut water use: spread out laundry, showers and the dishwasher.
  • Keep people, pets and vehicles off wet spots and away from any sewage.
  • Never enter or lean into a septic tank: the gases inside can be deadly.
  • Note when the tank was last pumped and where the lids are, if you know.

Slow drains, odors or a backup? Tell us what is happening. Request septic service